Jenkins Joint Filler - 5 litres
Add this product to your cart below.
<'td> |
Product |
Price |
Qty |
Add To Cart |
|
Performance Preparation Application The surface must be clean, dry and free from contamination. New and existing floors sanded back to bare wood should be given a final sanding and the dust kept to be added to the filler.
- Mix approximately equal parts of Joint Filler and sawdust.
Jenkins Joint Filler should be mixed with sawdust from the last sanding into a smooth paste. The filler should be applied across the whole surface, making sure joints are fully filled.
- Application should be made using a trowel or spatula.
- Leave to dry for 30 - 60 minutes depending on conditions.
- Deep gaps may require two or more layers of filler.
- Avoid using in high humidity or in temperatures below 15 deg. C
|